Project Overview: (Scope of Work)

EDECS is proud to be embarking on revitalizing the Jeddah South Container Terminal Works—Stage 3B & 4B project in Saudi Arabia, which covers 100,000 square meters of infrastructure development. This includes earthwork, meticulous paving layers, road marking, electrical networks, sewage networks, slot drain network installation, firefighting networks, and strategic reefer gantry positioning. This project aims to boost the port’s container handling capacity from 2.4 to 3 million TEUs upon completion.

Project Details:

Sector:
Infrastructure
Location:
Jeddah, Saudi Arabia
Name Of Client:
DP World
Consultant Name:
AECOM
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
6 Months
Start Date:
September 2023
Completion Date:
June 2024
Project Execution
Major Quantities
  • 150,000 Meters of Yard Heavy-Duty Paving
  • 100,000 Cubic Meters of Concrete
  • 46,000 m Aluminum Cables.
  • 15,000 m HDPE Pipes
  • 8 Mono-Piles
  • 8 High Masts
  • 30 Lighting Pole
Jeddah South Container Terminal Works - Stage 3B & 4B
Jeddah South Container Terminal Works - Stage 3B & 4B
Jeddah South Container Terminal Works - Stage 3B & 4B

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
June 2023
See More
Suez Canal Container Terminal
Suez Canal Container Terminal
October 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
February 2024
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
March 2021
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
January 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
July 2021
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
February 2024
See More