Project Overview: (Scope of Work)
EDECS is leading the infrastructure construction of the Shubra—Banha Bridge project in Egypt. In its third phase, the bridge, situated above the ring road and extending towards Banha Free Road, will establish a connection between Heliopolis and Shubra Banha. It will redirect traffic away from central Heliopolis onto the agricultural road. The bridge is 1050 meters long and 19 meters wide, with 4 lanes. This route bypasses the city center and significantly shortens travel time to a mere 8 minutes.
Project Details:
Name Of Client:
Ministry of Transport (Roads & Bridges Authority)
Consultant Name:
El Raeid Engineering Consultant
Project Type:
Infrastructure Works (Bridges)
Contract Details:
Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
18 Months
Completion Date:
January 2024