Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria

Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria

2023

Project Overview: (Scope of Work)

The project Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria in Egypt, led by EDECS, entails the construction of the infrastructure for marine terminals covering a vast storage area of 550,000m2, includes the installation of critical utility networks such as water, sewage, electrical, and firefighting systems. This involves a robust MV power network spanning 120Km of cables, 3 switchgear, and 16 substations, along with an LV power network covering 200Km and a SCADA system with over 9,000 points with 80 Km of Fiberoptics cables, a fire pump station, oil separators, a lifting station, and a water treatment plant. The berth infrastructure comprises 500,000m2 of space, capable of handling 41,000 TEUs and includes 75000 RORO area, 36 reefer structures, and 120 plugs to facilitate operations to ensure the terminal's operational efficiency and longevity.

Project Details:

Sector:
Infrastructure
Location:
Alexandria, Egypt
Name Of Client:
Egyptian Group for multi-purpose Terminal (EGMPT)
Consultant Name:
Dar Al-Handasah Shair and Partners
Project Type:
Infrastructure Works (Electromechanics)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
15 Months
Start Date:
March 2022
Completion Date:
June 2023
Project Execution
Major Quantities
  • 120Km MV Cables
  • 200Km of LV Cables
  • +9K Points with 80 Km Fiberoptics Cables
  • +12 Km Infrastructure Piping
  • +12Km Grated Channels
Integrated Services

Our comprehensive services significantly contributed to the success of this project:-

Marine Sector: Diaphragm wall quay wall & Dredging & Soil improvement

Building sector:  Port Buildings

Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria

Related Projects

Jeddah South Container Terminal Works - Stage 3B & 4B
Jeddah South Container Terminal Works - Stage 3B & 4B
June 2024
See More
Suez Canal Container Terminal
Suez Canal Container Terminal
October 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
December 2018
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
February 2024
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
March 2021
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
January 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
July 2021
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
February 2024
See More