Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)

Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)

2016

Project Overview: (Scope of Work)

At EDECS, we take pride in overseeing the project at Ras Al-Khair Seaport, Saudi Arabia, where our expertise is showcased through dredging operations, construction of a substantial gravity-type quay wall, and meticulous attention to detail in every aspect of the endeavor. The project at Ras Al-Khair Seaport involves dredging over 3.5 million cubic meters to level the basin and trenches, with reclamation exceeding 1.5 million cubic meters. Additionally, a 900-meter-long, 18-meter-deep gravity-type quay wall will be constructed using concrete blocks weighing up to 120 tons each. Other tasks include building a jetty for a 500-ton crane, soil improvement, and various installations. Under a Design & Build contract, the project spanned 29 months, starting in July 2014 and completed in December 2016. We remain committed to delivering exceptional results that exceed expectations.

Project Details:

Sector:
خبراء الانشاءات البحرية
Location:
Ras Al-Khair, الممكلة العربية السعودية
Name Of Client:
SEAPA - Seaports Authority, Kingdom of Saudi Arabia
Consultant Name:
Lievense Arabia
Project Type:
Concrete Blocks Quay Wall and Dredging
Associating companies:
Joint venture with Rawabi
Construction solution:
Batching Plant & Precast Plant
Main sub-consultants:
Geo-Consultants / COWI

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Design and Build Contract
Contract Duration:
29 Months
Start Date:
يوليو 2014
Completion Date:
ديسمبر 2016
Project Execution
Major Quantities
  • 900 meters of gravity quay wall with 200,000 m3 of concrete for the quay-wall Concrete blocks
  • 3,500,000 m3 Dredging and reclamation using Cutter suction dredger.
  • 4,000 tons Epoxy coated steel reinforcement
  • 350,000 m3  Graded rocks.
Main Equipment
  • Cutter Suction Dredger
  • Vibro Compaction Machines 
  • Floating Crane 250 ton 
  • Setting Barges 
  • Material Barges 3000 Tons 
  • Tug Boat 
  • Diving Station 
  • Crane 500 Tons
  • Cranes” Variant Capacity”
Design Methodology
  • Dredging using cutter suction dredgers
  • Installation of concrete blocks using Cranes and split barge
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)

Related Projects

محطة تحيا مصر متعددة الأغراض على أرصفة بميناء الأسكندرية البحري 55/62
محطة تحيا مصر متعددة الأغراض على أرصفة بميناء الأسكندرية البحري 55/62
أبريل 2024
See More
أعمال تنفيذ أرصفة الأحواض ٢، ٤، ٦ بميناء السخنة
أعمال تنفيذ أرصفة الأحواض ٢، ٤، ٦ بميناء السخنة
فبراير 2024
See More
إنشاء محطة متعددة الأغراض علي رصيف ١٠٠ البحري بميناء الدخيلة
إنشاء محطة متعددة الأغراض علي رصيف ١٠٠ البحري بميناء الدخيلة
يونيو 2024
See More
Construction of Eastern Quay Wall in East Port Said
Construction of Eastern Quay Wall in East Port Said
فبراير 2020
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
ديسمبر 2018
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
ديسمبر 2023
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
فبراير 2024
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
Construction of Marassi Marina Prefabricated Aluminium Pontoons
سبتمبر 2021
See More