Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

2024

Project Overview: (Scope of Work)

EDECS, as the main contractor, is responsible for constructing a 480-meter quay wall of diaphragm type with a tie rod system for Basin 2 at Al Sokhna Seaport, Egypt. This includes essential furnishings such as fenders, bollards, ladders, and an anchoring system. A barrette wall will also be constructed to secure the tie rod system. MEP works and road construction for the area behind the quay wall are also part of the scope. The project involves significant quantities, including 480 front and back diaphragm wall panels, 22 bored piles, 160 tie rods, and extensive concrete and pavement installations.

Project Details:

Sector:
خبراء الانشاءات البحرية
Location:
Ain Al Sokhna, مصر
Name Of Client:
DP world Sokhna
Consultant Name:
Pacer Consultants
Project Type:
article1
Associating companies:
Baue
Construction solution:
Batching Plant
Main sub-consultants:
Nile Engineering Consulting Bureau NECB

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction (Traditional Form)
Contract Duration:
13 Months
Start Date:
يناير 2023
Completion Date:
فبراير 2024
Project Execution
Major Quantities
  • 480 meters of Quay wall with 18 m depth
  • 480 front diaphragm wall panels (1.2 m width X 30 m depth)
  • 480 back diaphragm wall panels (0.8 m width X 15 m depth)
  • 22 bored piles (1.2 m diameter X 30 m depth)
  • 160 tie rods 
  • 7,000 ton steel reinforcement installation 
  • 27,000 cubic meters of concrete
  • 16600 m2 of concrete block pavement
  • Install 1600 m2 keystone
  • Install 4 high mast 
Main Equipment
  • Hydrophraise Cutter Machines
  • Heavy Cranes 
Design Methodology

Diaphragm walls using drilling rigs and Hydrophraise

Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:-

  • Infrastructure sector: Earthwork and Infrastructure Works
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

Related Projects

محطة تحيا مصر متعددة الأغراض على أرصفة بميناء الأسكندرية البحري 55/62
محطة تحيا مصر متعددة الأغراض على أرصفة بميناء الأسكندرية البحري 55/62
أبريل 2024
See More
أعمال تنفيذ أرصفة الأحواض ٢، ٤، ٦ بميناء السخنة
أعمال تنفيذ أرصفة الأحواض ٢، ٤، ٦ بميناء السخنة
فبراير 2024
See More
إنشاء محطة متعددة الأغراض علي رصيف ١٠٠ البحري بميناء الدخيلة
إنشاء محطة متعددة الأغراض علي رصيف ١٠٠ البحري بميناء الدخيلة
يونيو 2024
See More
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
Construction of Two Berths (9 & 10) at Ras Al-Khair Seaport (Design & Build Contract)
ديسمبر 2016
See More
Construction of Eastern Quay Wall in East Port Said
Construction of Eastern Quay Wall in East Port Said
فبراير 2020
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
ديسمبر 2018
See More
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
Construction of multi-purpose Terminal at Safaga Seaport (Quay Wall)
ديسمبر 2023
See More
Construction of Marassi Marina Prefabricated Aluminium Pontoons
Construction of Marassi Marina Prefabricated Aluminium Pontoons
سبتمبر 2021
See More