Project Overview: (Scope of Work)

EDECS embarks on the Construction of a 680m multi-purpose Terminal at Damietta Seaport project in Egypt. This project involves MEP works, road construction, and yard development across a vast storage area spanning 55,000 square meters. Key components include utility network installation (water, sewage, electrical, firefighting), substation establishment (switchgear, transformers, generators), communication and security systems implementation, and the deployment of Building Management System (BMS) and Supervisory Control and Data Acquisition (SCADA) technology. The project also encompasses constructing service buildings and warehouses, emphasizing functionality and security.

Project Details:

Sector:
خبراء إنشاءات البنية التحتية
Location:
Damietta, مصر
Name Of Client:
Damietta Port Authority (DPA)
Consultant Name:
Maritime Research & Consultation Center (MRCC)
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
17 Months
Start Date:
يوليو 2017
Completion Date:
ديسمبر 2018
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:

Building sector: Port Buildings and Infrastructure

Marine sector: Diaphragm wall Quay Wall

Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
يونيو 2023
See More
Jeddah South Container Terminal Works - Stage 3B & 4B
Jeddah South Container Terminal Works - Stage 3B & 4B
يونيو 2024
See More
Suez Canal Container Terminal
Suez Canal Container Terminal
أكتوبر 2024
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
فبراير 2024
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
مارس 2021
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
يناير 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
يوليو 2021
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
فبراير 2024
See More