LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo

LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo

2024

Project Overview: (Scope of Work)

Explore the latest collaborative project by EDECS The LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo project in Egypt, a collaborative effort between the Ministry of Transport, the National Authority for Tunnels, EDECS, and Chinese CREC-AVIC companies, that entailed constructing a 2,800-meter Light Speed Rail viaduct and installing 21,150 meters of deep foundation piles. Additionally, our responsibilities include erecting the concrete structures for the main bridge, such as foundations, columns, and retaining walls, and producing 80,000 cubic meters of precast prestressed concrete with bearing and expansion joints.

Project Details:

Sector:
خبراء إنشاءات البنية التحتية
Location:
Cairo, مصر
Name Of Client:
Ministry of Transportation & The National Authority of Tunnels
Consultant Name:
Khatib & Alami
Project Type:
Infrastructure Works (Bridges-Railway)

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
31 Months
Start Date:
يوليو 2021
Completion Date:
فبراير 2024
Project Execution
Major Quantities
  • 537 Bored Piles (1.2 m Diameter & 11,200 m Length)
  • 47 Bored Piles (1.5 m Diameter & 950 m Length)
  • 80,000 m3 Concrete
  • 17,000 Tons Steel
Design Methodology
  • Precast Beams
  • Steel Str Beams
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project:

Building sector: Buildings and Site development

LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
يونيو 2023
See More
Jeddah South Container Terminal Works - Stage 3B & 4B
Jeddah South Container Terminal Works - Stage 3B & 4B
يونيو 2024
See More
Suez Canal Container Terminal
Suez Canal Container Terminal
أكتوبر 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
ديسمبر 2018
See More
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
فبراير 2024
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
مارس 2021
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
يناير 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
يوليو 2021
See More