Project Overview: (Scope of Work)

EDECS is constructing the Western Edge Retaining Wall for the Basin 2, Al Sokhna Seaport project in Egypt. This entails erecting a 480-meter-long quay wall equipped with furnishings such as fenders, bollards, ladders, and an anchoring system. We also construct a barrette wall to secure the tie rod system.

Project Details:

Sector:
خبراء إنشاءات البنية التحتية
Location:
Ain Al Sokhna, مصر
Name Of Client:
DP World Sokhna
Consultant Name:
Pacer Consultants
Project Type:
Infrastructure Works

Contract Details:

Role in Contract:
Main Contractor
Contract Type:
Construction
Contract Duration:
13 Months
Start Date:
يناير 2023
Completion Date:
فبراير 2024
Project Execution
Major Quantities
  • Install Drainage, Electric, and Firefighting Network
  • Install 4 High Mast
Integrated Services

Our comprehensive services in different sectors significantly contributed to the success of this project: 

Marine sector: Diaphragm Wall Quay Wall

Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport
Western Edge Retaining Wall 480m for Basin 2, Al Sokhna Seaport

Related Projects

Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
Infrastructure Works: Berths 55/62 Tahya Masr multi-purpose Terminal Alexandria
يونيو 2023
See More
Jeddah South Container Terminal Works - Stage 3B & 4B
Jeddah South Container Terminal Works - Stage 3B & 4B
يونيو 2024
See More
Suez Canal Container Terminal
Suez Canal Container Terminal
أكتوبر 2024
See More
Construction of 680 m multi-purpose Terminal at Damietta Seaport
Construction of 680 m multi-purpose Terminal at Damietta Seaport
ديسمبر 2018
See More
Al-Fayrouz Fish Farms, East of Port Said
Al-Fayrouz Fish Farms, East of Port Said
مارس 2021
See More
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
Construction of Control Gates & Barrages of Bahr Al-Baqar Drain
يناير 2021
See More
Ahl Misr Walkway Nile River – Cairo
Ahl Misr Walkway Nile River – Cairo
يوليو 2021
See More
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
LRT (Kayan – NAC) Viaduct New Administrative Capital – Cairo
فبراير 2024
See More